Fires: S-Bahn line 1 is running again as scheduled

0
40

After a fire service operation and a signal failure on Saturday evening, the trains on the S1 line in southwest Berlin are running as scheduled again. The disruptions were resolved shortly before midnight, a railway spokeswoman said on Sunday morning. Previously, the S-Bahn only ran every 20 minutes between Potsdam and Berlin-Schöneberg. The cause was a signal failure in Berlin-Zehlendorf.

A fire service operation at the Botanischer Garten S-Bahn station caused further problems on Saturday. The route between Zehlendorf and Schöneberg was therefore temporarily interrupted.

A spokesman for the Berlin fire department told the German Press Agency that smoke had developed on an S-Bahn train due to a defective brake system. Because the train was at the stop at the time, all passengers were able to get off. No one was injured.

© dpa-infocom, dpa:240901-930-219315/1

This is a message directly from the dpa news channel.

Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here