New closures in the industrial area and in Babelsberg

0
31

Also in the week from 16 to 22 September, due to construction work at various locations in Potsdam Traffic jams are to be expected.

From Monday, the road will be closed for the development of the new Babelsberg lido. Babelsberg Park between Humboldt Bridge/Havel Street and the entrance to the beach construction site will be closed until the end of March 2025. Pedestrians and cyclists must use the existing diversion. From Tuesday, the road At the office tower Closed until October 24th due to pipeline work between Zum Heizwerk and Möbelhof.

Due to an accident, the right-turn lane of the Zeppelinstrasse in Geschwister-Scholl-Straße will probably be closed until Friday. In the Heinrich-Mann-Allee From the turning point at Rehbrücke station, traffic will be directed as a one-way street heading out of the city. Traffic heading into the city will be diverted via Am Buchhorst and Drewitzer Straße.

Due to an accident, the bicycle path at the Heinrich-Mann-Allee. The Friedrich-Ebert-Strasse will remain completely closed until the beginning of November due to the renewal of tram tracks between Helene-Lange-Straße and Puschkinallee. The Rudolf-Breitscheid-Strasse between Griebnitzsee train station and the Berlin border. From Stubenrauchstrasse, the street is one-way towards Berlin. Traffic towards Potsdam is diverted via Stubenrauchstrasse.

The road remains closed At Böttcherberg between Tannenstraße and Tannenweg. The closure in the Rückkertstrasse is still in place this week. Also blocked is the Brandenburg Street between Friedrich-Ebert-Straße and Am Bassin. The closure of the Bruno-H.-Bürgel-Straße.

Further construction site information at mobil-potsdam.de

Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here